X-Git-Url: https://git.njae.me.uk/?a=blobdiff_plain;f=2019%2F2b.plaintext;fp=2019%2F2b.plaintext;h=cbe2084326b58ed34d28206883378989a9e5093d;hb=6636f0fdbfd6164cf130a0731d58b90528ef6761;hp=0000000000000000000000000000000000000000;hpb=3930cbab95673bed1ee1b4e1995b64b490852d06;p=cipher-tools.git

diff --git a/2019/2b.plaintext b/2019/2b.plaintext
new file mode 100644
index 0000000..cbe2084
--- /dev/null
+++ b/2019/2b.plaintext
@@ -0,0 +1,17 @@
+Apollo Ten
+Spacecraft Operational Trajectory
+First Revision
+This document contains updated information about the planned lunar orbital operations for the mission and has been compiled to satisfy flight crew/flight controller training and simulation requirements.
+
+The following mission phases remain UNCHANGED from the original plan:
+Launch, which ends with insertion into earth parking orbit (EPO).
+Earth orbit coast, which ends with Translunar Injection (TLI).
+Trans Lunar coast, which ends with Lunar Orbit Insertion (LOI).
+Trans Earth coast, which ends with re-entry into the mid-Pacific recovery area.
+
+The total mission duration will be approximately EIGHT days.
+
+The report includes significant changes to Lunar orbital operations, which start at LOI and end with Trans Earth lnjection. NOTE THESE IMPORTANT TRAJECTORY CHANGES
+
+The prime objective of the LOI-TEI phase will be to demonstrate all
+components of Mission G except those which directly involve Lunar Module powered descent and powered ascent.